Welcome to Bei Fang Investigation,Design & Research CO.LTD!
Settings for home page/Add to Favorites

Bei fang Investigation,Design & Research CO.LTD

中文版 022-28702841
Overseas Projects

Rotor Lifted In Place for Zongo II Hydroelectric Station in DRC

Release Time: 2016-09-12    Source:    Views:35642    [Back to list]

September 6, the rotor of generator unit No.3 of Zongo II Hydroelectric Station was lifted in place.

Zongo II Hydroelectric Station is located on Inkisi River, with a design head of 105m and power discharge of 160.5m3/s. The total installed capacity of the station is 150MW (3X50MW).